 | 2010 Revell Resources 100 m3 / hour Paste Fill Plant
2010 Revell Resources 100 m3 / hour Paste Fill Plant
The plant package includes: 250 tonne binder storage silo with dust collector, binder screw feeder, tailings...... more details
|
 | 2015 Transtank MC73-NPB 70 KL Lube Container
2015 Transtank MC73 Tank 71.5 KL Lube Container built to AS1692 suitable for C1/C2 combustible liquids
Unit has been installed and was used for a matter of weeks and...... more details
|
 | 600 KW Goninan & Co Double Drum Ore Haulage Winder
600 KW Goninan & Co Double Drum Ore Haulage Winder
Also available Service Personnel Winder, 43 mtr Head Frame and spares with all design and engineering drawings...... more details
|
 | Head Frame 43 mtrs C/w Skips, Man Cages, Capels & Spares
Head Frame 43 mtrs with Sheave Diameter of 2.55 mtr set up for Ore Haulage and service / Personnel movements
Also available Vickers Hoskins Ore Haulage Winder,...... more details
|
 | 600 KW Vickers Hoskins Double Drum Service & Personnel Winder
600 KW Vickers Hoskins Double Drum Service & Personnel Winder
Also available Ore Haulage Winder, 43 mtr Head Frame and spares with all design and engineering drawings...... more details
|
 | 279 Bed Camp with Nomad & Fleetwood Buildings SOLD
279 Person Camp installed on site 2005 with Administration, Kitchen / Diner, Wet Mess, 5 x Laundries, Communications, Gym Building, TV room plus potable water storage...... more details
|
 | 2007 JFK Engineering ~75 TPH Batch plant
JFK Engineering ~75 TPH Batch plant with estimated 40m3 cement silo
Designed by GW Wilshaw Engineering and we understand was installed around September 2007 and was...... more details
|