This plant was designed in 2007 by Combined Resource Engineering and installed in 2009 by GR Engineering with ramp-up to full production during 2010.
The package includes: 4 x cement storage silos, blowers and Cyclonaire unloader, WAM paste mixer, cement day bin, conveyors, control room & MCC, water tanks, plant compressed air system all piping and control systems and valves.
Site inspections are welcome by prior arrangement.
The plant is designed for wet or dry feed and is offered on an "As Is Where Is" basis with the buyer responsible for all costs associated with dismantling & removal of the plant in line with site safety & operating procedures.
Available ex Nifty Copper via Telfer region, Western Australia.